JORC-compliant resource. Modern infrastructure. Proven processing capacity. Restart-ready with the right capital partner.
30 km from Swakopmund, 75 km from Walvis Bay. All road infrastructure, utilities, and surface facilities fully established.

LHD loader at portal



Underground operations — Tsoaxaub mine
Modern bulk mining method replacing historic narrow-zone selective approach. Higher throughput, lower unit cost, safer underground conditions.
The flotation plant produces two separate concentrate streams:





| Period | Tonnes Mined | Tonnes Processed | Zn Concentrate (t) | Pb Concentrate (t) | Status |
|---|---|---|---|---|---|
| 2019 | 70,241 | 47,082 | 3,230 | 729 | Active |
| Q1 2020 | 28,040 | 22,966 | 2,479 | 354 | Active |
| Q2 2020+ | Care & maintenance. All permits and infrastructure remain active. | C&M | |||
The 2022 VTEMPlus survey across EPL 2902 and EPL 5075 identified 56 potential mineral deposit targets — a substantial pipeline beyond the existing 7-year JORC base.

RC drilling — exploration programme

RC drilling rig — EPL license area